to all the main residences of Russian President Vladimir Putin, railway branches were brought, and secret stations were built nearby, the project found out. This confirms the message of the Center “Dossier” that the head of state has recently begun to use the train, not an airplane.
She appeared from VETs on Valdai. She leads to the president’s residence. In the fall of 2022, the project correspondent discovered a guarded railway station with a helicopter site near the village of Dolgoy Boroda – this is the nearest settlement to the Valdai residence beloved by Putin, in the Valdai National Park. Three local residents informed the “project” that the station and a special railway line were built only for the head of state, and the guard drove the correspondent when he tried to approach the fence of the protected station.
According to satellite pictures, the station and the railway for Putin on Valdai were built in 2019.
The second branch is stretched to Novo-Ogarevo. According to satellite images, the station in Novo -Ogravo appeared in 2015 – it is located 400 meters from Putin’s residence in the Moscow region. The land under the station was removed from private ownership in favor of the FSO by the decision of the then Prime Minister Dmitry Medvedev. The special station itself is designed for a small number of wagons and is hidden behind a high fence, on which the surveillance cameras are installed every 10 meters.
There are special railway tracks in Sochi. To stop the train at the Sochi residence of the Bochars stream in the area of 2017, a platform and a new dead end railway branch appeared, hidden from the paths along which the train walks on a high fence.
The president’s special train has repeatedly hit the lens of Trainspotters and railway workers. For example, in November 2018 or in April 2020. According to the former driver, with whom the project spoke, the armored train of Putin is based in the depot at the Moscow-Kalanchevskaya station, where there is a closed station for VIP Person. This special checkpoint, as the correspondent of the “project” was convinced, and now is functioning – the surrounding high fence is additionally strengthened with trunks. In 2017, directly to the platform of the VIP station on Kalanchevka, they put a new road for the motorcade.