Operations on the Jaehan oil terminal in southern Turkey are suspended.
This was stated by a representative of the Ministry of Energy of Turkey.
According to him, the Kirkuk-Jajan pipeline, according to which Iraqi oil is transported to Jaykhan, and the Baku-Tbilisi-Jahan pipeline, through which Azerbaijani oil is transported to Turkey, were not damaged.
Oil transportation through these pipelines continues.
Note that the Jaikhan oil terminal is located 155 km from the Earthquake Epiccenter.