Construction of the second highway to the city of Shusha will end in 2024, the deputy head of the Main Department of Operation and Repair of the State Agency Roads Azerbaijan is made by Rustamov.
According to him, this car road of the technical category will begin with the 157th kilometer of the M-6 M-6 Highway – Goradiz – Agband – Zangezur. The length of it will be 81.6 kilometers, in different sections it will have four and six lanes.
Rustamov noted that thanks to the construction of bridges and tunnels on the road will be provided with high-speed regime. This track will be shorter than the road victory by 20.3 kilometers.