In the south-east of Turkey, on Saturday, the official opening ceremony of the largest reservoir and HPP “Balls” took place on the Tiger River, the agency “Anadolu” reports.
In the opening ceremony of the reservoir with a hydropower station, the name of Turkey Recep Tayip Erdogan, President of Turkey Recep Tayyip Erdogan, took part.
The “Olsu” reservoir was the third largest artificial reservoir of Turkey, after the reservoir of the Ataturk and Keban reservoir. The height of the dam is 135 meters, the volume of water is 10.6 billion cubic meters.